The Developer Conundrum – Challenges to Operations
Time: 14:30 - 15:10
Date: 19 March
Synopsis
From conception to energisation, there are a conundrum of obstacles to navigate for the developer to operationalise their battery. What are the biggest challenges faced in the market to deploying BESS in Australia, and what are strategies for navigating these?
As an example..
- Permitting
- Establishing Connections
- Conceptualising design
- One of the major considerations right now for developers and asset operators alike, is whether to build your battery with additional capacity, or add it on at a later date?
Moderator
Simon Mason Partner - Everoze
Speaker
Aydin Kizilirmak Head of Grid Connection and Approvals - Potentia Energy
Daphne Yao Chief Executive Officer - Valent Energy
Tom Best COO - Eku Energy
« Back