The Developer Conundrum – Challenges to Operations

Time: 14:30 - 15:10
Date: 19 March

Synopsis

From conception to energisation, there are a conundrum of obstacles to navigate for the developer to operationalise their battery. What are the biggest challenges faced in the market to deploying BESS in Australia, and what are strategies for navigating these?

As an example..

  1. Permitting
  2. Establishing Connections
  3. Conceptualising design
  4. One of the major considerations right now for developers and asset operators alike, is whether to build your battery with additional capacity, or add it on at a later date?

Moderator

Speaker

« Back